Another area in Nha Trang City is being built with a 40-storey building.
Project news
18/03/2025
On March 18, the Office of the Khanh Hoa Provincial People's Committee announced that the Provincial People's Committee has issued two decisions approving the Project to Adjust the Zoning Plan (scale 1/2000) along Pham Van Dong Street, Vinh Hoa Ward - Vinh Luong Commune, Nha Trang City and the Project to Adjust the Zoning Plan (scale 1/2000) of the Residential Area North of Provincial Road 3, Phuoc Dong Commune - Vinh Thai, Nha Trang City.

The study area for planning adjustment The Project for Adjusting the Zoning Plan (scale 1/2000) along Pham Van Dong Street, Vinh Hoa Ward - Vinh Luong Commune, has a total area of over 328 hectares in Vinh Hoa Ward and Vinh Luong Commune, oriented for tourism - service development.
This is an area bordered to the east by the East Sea, to the west by Co Tien Mountain, to the south by the East Sea and Duong De area, to the north by the Project for Adjusting the Zoning Plan (scale (1/2000) of Vinh Luong Commune.
The nature of the planning is that the area focuses on tourism - service development. The forecast scale of tourists in this area by 2030 is 25,000 people, by 2040 about 32,800 people.
Regarding land planning, for tourism - service land in coastal areas, the maximum combined construction density is 25%, maximum height is 40 floors. Mountainous areas have a maximum aggregate construction density of 10% and a maximum height of 7 floors. For land with limited green space, the maximum aggregate construction density is 5% and a maximum height of 1 floor.
This area is expected to be divided into 3 sub-areas, of which 1 sub-area has the function of coastal tourism services with a maximum aggregate construction density of 25%; 1 sub-area has the function of a tourism service area combined with hills and mountains with a maximum aggregate construction density of 10%. Finally, there is a sub-area with a forestry function (an experience area associated with the mountain ecosystem).
Regarding investment phases, by 2030, the traffic infrastructure system, main technical infrastructure works, and landscape investment along Pham Van Dong Street and service - tourism areas will be completed. By 2040, the development of tourism services will be completed according to the plan.

For the Project of Adjusting the Zoning Plan (scale 1/2000) of the Residential Area North of Provincial Road 3, Phuoc Dong - Vinh Thai Commune, Nha Trang City: the area for planning adjustment research has a total area of 596 hectares in Phuoc Dong Commune and Vinh Thai Commune, Nha Trang City; located on the east side of the Tac River, on the west side of Chin Khuc Mountain, on the south side of Provincial Road 3, on the north side of the Tac River.
The nature of the planning is the existing urban residential area to be renovated, renovated and newly developed. Accordingly, the expected population size by 2030 is about 28,000 people, by 2040 is about 54,600 people.
According to the land use planning, the land for housing groups (including the existing group, renovation and renovation and new housing groups) has a maximum construction density of 60%, and a maximum height of 7 floors. Mixed-use land for housing and services with a maximum construction density of 60% and a maximum height of 24 floors.
The project is divided into 2 investment phases. Specifically, by 2030, renovate and embellish existing urban areas; complete the main traffic infrastructure system; implement urban embellishment items (trees, parks); implement social infrastructure works (apartments, kindergartens, commercial centers). By 2040, complete urban development according to the plan.
Based on the approved Project to Adjust the Planning of 2 Sub-Zones, the People's Committee of Khanh Hoa province requests the People's Committee of Nha Trang City to organize the public announcement of the approved sub-zone planning adjustment; develop a plan to implement the planning in sync with the investment in social infrastructure and technical infrastructure systems in the urban area; review and adjust lower-level plans that are inconsistent with this plan and related plans to ensure consistency (if any).
Get the latest information !
Receive the latest market information sent via email week
Featured news
Articles on the same topic
Sở Xây dựng Khánh Hòa và các đơn vị liên quan đang tiếp tục hoàn thiện kế hoạch chi tiết, để tổ chức hội nghị lấy ý kiến người dân về các khu tái định cư phục vụ dự án đường sắt tốc độ cao Bắc - Nam.
14.08.2025
UBND tỉnh Khánh Hòa vừa quyết định giao Công ty CP Đầu tư Xây dựng và Phát triển đô thị Minh Ngọc liên danh với Công ty CP Xây dựng và Ứng dụng Công nghệ Delta V làm chủ đầu tư dự án nhà ở xã hội tại phường Nha Trang với tổng vốn đầu tư hơn 2.200 tỷ đồng.
14.08.2025
Liên danh có công ty thành viên thuộc Sun Group sắp khởi công khu đô thị hỗn hợp hơn 17.000 tỷ đồng tại Nam Nha Trang, quy mô 226 ha, dự kiến cung cấp hơn 5.700 căn nhà ở.
09.08.2025
Tỉnh Khánh Hòa được Thủ tướng giao xây dựng hơn 10.000 căn nhà ở xã hội trong giai đoạn 2025 - 2030, nhưng tỉnh dự kiến hoàn thành hơn 40.000 căn đến năm 2030.
01.08.2025
Liên danh của Vinhomes bắt đầu triển khai phân khu đầu tiên hơn 2.000 ha thuộc khu đô thị mới Cam Lâm từ 2026, vận hành từ quý IV/2028.
24.07.2025
Thủ tướng đề nghị tập đoàn Nhật Bản cùng đối tác Việt Nam nhanh chóng triển khai dự án Thành phố thông minh Bắc Hà Nội 4,2 tỷ USD.
23.07.2025
Ngày 18/7, UBND tỉnh Khánh Hòa cho biết, địa phương đã đăng ký với Bộ Xây dựng và đang chuẩn bị khởi công 4 dự án quy mô lớn, với vốn đầu tư hàng nghìn tỷ đồng nhằm chào mừng kỷ niệm 80 năm Quốc khánh Nước Cộng hòa xã hội chủ nghĩa Việt Nam (2/9/1945 – 2/9/2025) vào tháng 9 tới.
18.07.2025
UBND tỉnh thành lập Ban Chỉ đạo xử lý vướng mắc công tác bồi thường, hỗ trợ, tái định cư trên toàn địa bàn, gỡ điểm nghẽn cản trở tiến độ dự án trọng điểm.
17.07.2025
Các ngành chức năng và địa phương liên quan đang nỗ lực để triển khai 2 dự án khu đô thị trên địa bàn tỉnh Khánh Hòa gồm: Dự án Khu đô thị mới cao cấp Cổ Mã, xã Tu Bông và Khu đô thị hỗn hợp Nha Trang để kịp khởi công vào giữa tháng 8.
11.07.2025
Thị trường bất động sản Nha Trang đang chứng kiến sự dịch chuyển mạnh mẽ. Những khu đô thị đơn thuần, dự án nghỉ dưỡng truyền thống dần nhường chỗ cho mô hình đô thị nghỉ dưỡng đa chức năng – nơi giao thoa giữa an cư, đầu tư và tận hưởng, đích ngắm mới của cả nhà đầu tư lẫn những cư dân tìm kiếm chuẩn sống khác biệt.
11.07.2025

Typical projects
50-70 million/m2
50-70 million/m2
48 triệu/ m2
50-70 million/m2
50-70 million/m2
